After the mold was constructed, we could then cast our canoe onto the form. This was a big project that took us about 4 hours to complete.
Once this was all completed, we placed sheets on top to distribute the water from a sprinkling system overhead. The water from this helps create a stronger concrete. The canoe then cured for 28 days.
No comments:
Post a Comment